MISO Queue Project J189 — Wind in Minnehaha, South Dakota

MISO Queue Project J189 — Wind in Minnehaha, South Dakota is a 200.0 MW wind interconnection project in Minnehaha, South Dakota with a current status of withdrawn. It is proposed to connect at Anson Substation.

200.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J189 — Wind in Minnehaha, South Dakota
Queue IDJ189
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity200.0 MW
StateSouth Dakota
CountyMinnehaha
Point of interconnectionAnson Substation
Requested (queue) date2010-12-20
Proposed in-service date2012-12-31
Operational date
Withdrawn date2012-07-12
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata