MISO Queue Project J210 — Solar in Butler, Ohio

MISO Queue Project J210 — Solar in Butler, Ohio is a 20.0 MW solar interconnection project in Butler, Ohio with a current status of withdrawn. It is proposed to connect at Todd Hunter 69 kV Substation.

20.0 MWCapacity
WithdrawnStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameMISO Queue Project J210 — Solar in Butler, Ohio
Queue IDJ210
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologySolar
Capacity20.0 MW
StateOhio
CountyButler
Point of interconnectionTodd Hunter 69 kV Substation
Requested (queue) date2011-04-05
Proposed in-service date2013-10-30
Operational date
Withdrawn date2012-02-22
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.