MISO Queue Project J211 — Gas in Summit, Ohio

MISO Queue Project J211 — Gas in Summit, Ohio is a 268.0 MW gas interconnection project in Summit, Ohio with a current status of withdrawn. It is proposed to connect at FE Martin 69 kV Substation.

268.0 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project J211 — Gas in Summit, Ohio
Queue IDJ211
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyGas
Capacity268.0 MW
StateOhio
CountySummit
Point of interconnectionFE Martin 69 kV Substation
Requested (queue) date2011-04-11
Proposed in-service date2013-06-01
Operational date
Withdrawn date2011-06-01
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata