MISO Queue Project J224 — Other in Clay, Indiana

MISO Queue Project J224 — Other in Clay, Indiana is a 29.5 MW other interconnection project in Clay, Indiana with a current status of withdrawn. It is proposed to connect at Stauton - Keller 69kV.

29.5 MWCapacity
WithdrawnStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameMISO Queue Project J224 — Other in Clay, Indiana
Queue IDJ224
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyOther
Capacity29.5 MW
StateIndiana
CountyClay
Point of interconnectionStauton - Keller 69kV
Requested (queue) date2011-08-22
Proposed in-service date2014-06-01
Operational date
Withdrawn date2013-04-04
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata