MISO Queue Project J244 — Gas in Christian, Illinois

MISO Queue Project J244 — Gas in Christian, Illinois is a 726.0 MW gas interconnection project in Christian, Illinois with a current status of withdrawn. It is proposed to connect at AMIL Pawnee 345 kV Substation.

726.0 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project J244 — Gas in Christian, Illinois
Queue IDJ244
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyGas
Capacity726.0 MW
StateIllinois
CountyChristian
Point of interconnectionAMIL Pawnee 345 kV Substation
Requested (queue) date2012-05-21
Proposed in-service date2012-02-29
Operational date
Withdrawn date2013-06-24
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata