MISO Queue Project J270 — Wind in Newton, Indiana

MISO Queue Project J270 — Wind in Newton, Indiana is a 197.8 MW wind interconnection project in Newton, Indiana with a current status of withdrawn. It is proposed to connect at NIPSCO Thayer - Schafer 138 kV.

197.8 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J270 — Wind in Newton, Indiana
Queue IDJ270
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity197.8 MW
StateIndiana
CountyNewton
Point of interconnectionNIPSCO Thayer - Schafer 138 kV
Requested (queue) date2013-03-07
Proposed in-service date2018-09-15
Operational date
Withdrawn date2017-05-23
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata