MISO Queue Project J276 — Wind+Battery in Iroquois, Illinois

MISO Queue Project J276 — Wind+Battery in Iroquois, Illinois is a 150.0 MW wind+battery interconnection project in Iroquois, Illinois with a current status of withdrawn. It is proposed to connect at Sheldon South.

150.0 MWCapacity
WithdrawnStatus
MISOMarket
Wind+BatteryTechnology

Project facts

Canonical nameMISO Queue Project J276 — Wind+Battery in Iroquois, Illinois
Queue IDJ276
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind+Battery
Capacity150.0 MW
StateIllinois
CountyIroquois
Point of interconnectionSheldon South
Requested (queue) date2013-03-18
Proposed in-service date2014-08-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata