MISO Queue Project J319 — Other in Pope, Arkansas

MISO Queue Project J319 — Other in Pope, Arkansas is a 500.0 MW other interconnection project in Pope, Arkansas with a current status of withdrawn. It is proposed to connect at Entergy AR ANO-Pleasant Hill 500 kV line.

500.0 MWCapacity
WithdrawnStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameMISO Queue Project J319 — Other in Pope, Arkansas
Queue IDJ319
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyOther
Capacity500.0 MW
StateArkansas
CountyPope
Point of interconnectionEntergy AR ANO-Pleasant Hill 500 kV line
Requested (queue) date2013-12-19
Proposed in-service date2018-11-01
Operational date
Withdrawn date2018-01-08
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.