MISO Queue Project J322 — Solar in Renville, Minnesota

MISO Queue Project J322 — Solar in Renville, Minnesota is a 40.0 MW solar interconnection project in Renville, Minnesota with a current status of withdrawn. It is proposed to connect at 69 kV bus at Sacred Heart substation.

40.0 MWCapacity
WithdrawnStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameMISO Queue Project J322 — Solar in Renville, Minnesota
Queue IDJ322
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologySolar
Capacity40.0 MW
StateMinnesota
CountyRenville
Point of interconnection69 kV bus at Sacred Heart substation
Requested (queue) date2014-01-13
Proposed in-service date2014-11-01
Operational date
Withdrawn date2014-09-12
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata