MISO Queue Project J351 — Gas in St. Joseph, Indiana

MISO Queue Project J351 — Gas in St. Joseph, Indiana is a 715.0 MW gas interconnection project in St. Joseph, Indiana with a current status of active. It is proposed to connect at Stillwell 345 kV.

715.0 MWCapacity
ActiveStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project J351 — Gas in St. Joseph, Indiana
Queue IDJ351
Statusactive
Source statusactive
MarketMISO
TechnologyGas
Capacity715.0 MW
StateIndiana
CountySt. Joseph
Point of interconnectionStillwell 345 kV
Requested (queue) date2014-05-19
Proposed in-service date2020-03-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata