MISO Queue Project J371 — Nuclear in Ogle, Illinois

MISO Queue Project J371 — Nuclear in Ogle, Illinois is a 2,325.0 MW nuclear interconnection project in Ogle, Illinois with a current status of withdrawn. It is proposed to connect at Byron Substation.

2,325.0 MWCapacity
WithdrawnStatus
MISOMarket
NuclearTechnology

Project facts

Canonical nameMISO Queue Project J371 — Nuclear in Ogle, Illinois
Queue IDJ371
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyNuclear
Capacity2,325.0 MW
StateIllinois
CountyOgle
Point of interconnectionByron Substation
Requested (queue) date2014-06-24
Proposed in-service date2016-03-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.