MISO Queue Project J378 — Solar in Lonoke, Arkansas

MISO Queue Project J378 — Solar in Lonoke, Arkansas is a 79.1 MW solar interconnection project in Lonoke, Arkansas with a current status of withdrawn. It is proposed to connect at Lonoke East 115 kV substation.

79.1 MWCapacity
WithdrawnStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameMISO Queue Project J378 — Solar in Lonoke, Arkansas
Queue IDJ378
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologySolar
Capacity79.1 MW
StateArkansas
CountyLonoke
Point of interconnectionLonoke East 115 kV substation
Requested (queue) date2014-07-14
Proposed in-service date
Operational date
Withdrawn date2016-01-12
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata