MISO Queue Project J432 — Wind in Brookings, South Dakota

MISO Queue Project J432 — Wind in Brookings, South Dakota is a 98.0 MW wind interconnection project in Brookings, South Dakota with a current status of operational. It is proposed to connect at Brookings 345 kV substation.

98.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J432 — Wind in Brookings, South Dakota
Queue IDJ432
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity98.0 MW
StateSouth Dakota
CountyBrookings
Point of interconnectionBrookings 345 kV substation
Requested (queue) date2014-12-30
Proposed in-service date2019-09-01
Operational date2019-09-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.