MISO Queue Project J490 — Wind in an unlisted county, South Dakota

MISO Queue Project J490 — Wind in an unlisted county, South Dakota is a 60.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at The McIntosh Substation located 0.5 miles due North of the intersection of Route 31 and Route 12, located just off Route 31. The referenced intersection is 0.73 miles NE of the city center of McIntosh, SD..

60.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J490 — Wind in an unlisted county, South Dakota
Queue IDJ490
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity60.0 MW
StateSouth Dakota
County
Point of interconnectionThe McIntosh Substation located 0.5 miles due North of the intersection of Route 31 and Route 12, located just off Route 31. The referenced intersection is 0.73 miles NE of the city center of McIntosh, SD.
Requested (queue) date2015-11-11
Proposed in-service date2017-10-01
Operational date
Withdrawn date2017-09-01
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.