MISO Queue Project J490 — Wind in an unlisted county, South Dakota
MISO Queue Project J490 — Wind in an unlisted county, South Dakota is a 60.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at The McIntosh Substation located 0.5 miles due North of the intersection of Route 31 and Route 12, located just off Route 31. The referenced intersection is 0.73 miles NE of the city center of McIntosh, SD..
Project facts
| Canonical name | MISO Queue Project J490 — Wind in an unlisted county, South Dakota |
|---|---|
| Queue ID | J490 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Wind |
| Capacity | 60.0 MW |
| State | South Dakota |
| County | — |
| Point of interconnection | The McIntosh Substation located 0.5 miles due North of the intersection of Route 31 and Route 12, located just off Route 31. The referenced intersection is 0.73 miles NE of the city center of McIntosh, SD. |
| Requested (queue) date | 2015-11-11 |
| Proposed in-service date | 2017-10-01 |
| Operational date | — |
| Withdrawn date | 2017-09-01 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata