MISO Queue Project J596 — Wind in Big Stone, Minnesota
MISO Queue Project J596 — Wind in Big Stone, Minnesota is a 100.0 MW wind interconnection project in Big Stone, Minnesota with a current status of withdrawn. It is proposed to connect at Morris -Moro 115kV Tap.
100.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology
Project facts
| Canonical name | MISO Queue Project J596 — Wind in Big Stone, Minnesota |
|---|---|
| Queue ID | J596 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Wind |
| Capacity | 100.0 MW |
| State | Minnesota |
| County | Big Stone |
| Point of interconnection | Morris -Moro 115kV Tap |
| Requested (queue) date | 2016-05-09 |
| Proposed in-service date | 2018-09-01 |
| Operational date | — |
| Withdrawn date | 2018-10-12 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata