MISO Queue Project J644 — Solar in Greene, Illinois
MISO Queue Project J644 — Solar in Greene, Illinois is a 110.0 MW solar interconnection project in Greene, Illinois with a current status of active. It is proposed to connect at Jerseyville 138kV.
110.0 MWCapacity
ActiveStatus
MISOMarket
SolarTechnology
Project facts
| Canonical name | MISO Queue Project J644 — Solar in Greene, Illinois |
|---|---|
| Queue ID | J644 |
| Status | active |
| Source status | active |
| Market | MISO |
| Technology | Solar |
| Capacity | 110.0 MW |
| State | Illinois |
| County | Greene |
| Point of interconnection | Jerseyville 138kV |
| Requested (queue) date | 2016-05-09 |
| Proposed in-service date | 2020-12-01 |
| Operational date | 2024-11-06 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata