MISO Queue Project J650 — Wind in Grant, South Dakota
MISO Queue Project J650 — Wind in Grant, South Dakota is a 151.8 MW wind interconnection project in Grant, South Dakota with a current status of withdrawn. It is proposed to connect at 345kV interconnect at new Tap on proposed MVP Big Stone to Ellendale line.
Project facts
| Canonical name | MISO Queue Project J650 — Wind in Grant, South Dakota |
|---|---|
| Queue ID | J650 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Wind |
| Capacity | 151.8 MW |
| State | South Dakota |
| County | Grant |
| Point of interconnection | 345kV interconnect at new Tap on proposed MVP Big Stone to Ellendale line |
| Requested (queue) date | 2016-06-27 |
| Proposed in-service date | 2019-09-05 |
| Operational date | — |
| Withdrawn date | 2017-01-24 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata