MISO Queue Project R101 — Wind+Gas in Red Lake, Minnesota

MISO Queue Project R101 — Wind+Gas in Red Lake, Minnesota is a 4.6 MW wind+gas interconnection project in Red Lake, Minnesota with a current status of active. It is proposed to connect at 1.5 miles SW of Red Lake Falls, MN.

4.6 MWCapacity
ActiveStatus
MISOMarket
Wind+GasTechnology

Project facts

Canonical nameMISO Queue Project R101 — Wind+Gas in Red Lake, Minnesota
Queue IDR101
Statusactive
Source statusactive
MarketMISO
TechnologyWind+Gas
Capacity4.6 MW
StateMinnesota
CountyRed Lake
Point of interconnection1.5 miles SW of Red Lake Falls, MN
Requested (queue) date2016-03-17
Proposed in-service date2016-11-01
Operational date2020-12-11
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata