MISO Queue Project R66 — Wind in Adams, Iowa

MISO Queue Project R66 — Wind in Adams, Iowa is a 150.0 MW wind interconnection project in Adams, Iowa with a current status of withdrawn. It is proposed to connect at Creston - Clarinda 161 kV.

150.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project R66 — Wind in Adams, Iowa
Queue IDR66
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity150.0 MW
StateIowa
CountyAdams
Point of interconnectionCreston - Clarinda 161 kV
Requested (queue) date2009-04-30
Proposed in-service date2010-12-31
Operational date
Withdrawn date2011-01-14
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.