Mistflower Energy Center Storage (30INR0089)

Mistflower Energy Center Storage is a 312.9 MW other interconnection project in Runnels, Texas with a current status of operational. It is proposed to connect at Tap 345kV 60072 Odysseus – 60040 Bluff Creek .

312.9 MWCapacity
OperationalStatus
RunnelsMarket
OtherTechnology

Project facts

Canonical nameMistflower Energy Center Storage
Queue ID30INR0089
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketRunnels
TechnologyOther
Capacity312.9 MW
StateTexas
CountyRunnels
Point of interconnectionTap 345kV 60072 Odysseus – 60040 Bluff Creek
Requested (queue) date2026-02-25
Proposed in-service date
Operational date2030-06-01
Withdrawn date
DeveloperMistflower Energy Center LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata