Moccasin Low Head Hydro Project (751_1)

Moccasin Low Head Hydro Project is a 2.9 MW other interconnection project in Tuolumne, California with a current status of operational.

2.9 MWCapacity
OperationalStatus
CISOMarket
OtherTechnology

Project facts

Canonical nameMoccasin Low Head Hydro Project
Queue ID751_1
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyOther
Capacity2.9 MW
StateCalifornia
CountyTuolumne
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1987-07-01
Withdrawn date
Developer
Utility / transmission ownerCity & County of San Francisco - (CA)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata