Moccasin Storage (27INR0452)

Moccasin Storage is a 603.1 MW other interconnection project in Jones, Texas with a current status of operational. It is proposed to connect at Tap 345kV #60707 Kirchhoff - #60515 Clear Crossing CKT-1.

603.1 MWCapacity
OperationalStatus
JonesMarket
OtherTechnology

Project facts

Canonical nameMoccasin Storage
Queue ID27INR0452
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketJones
TechnologyOther
Capacity603.1 MW
StateTexas
CountyJones
Point of interconnectionTap 345kV #60707 Kirchhoff - #60515 Clear Crossing CKT-1
Requested (queue) date2025-01-28
Proposed in-service date
Operational date2028-07-01
Withdrawn date
DeveloperENGIE IR Holdings LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata