Mockingbird Solar is a 200.0 MW solar interconnection project in Hill, Texas with a current status of withdrawn. It is proposed to connect at tap 138kV 3522 Hillsboro - 3546 Whitney.

200.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameMockingbird Solar
Queue ID21INR0419
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity200.0 MW
StateTexas
CountyHill
Point of interconnectiontap 138kV 3522 Hillsboro - 3546 Whitney
Requested (queue) date2019-08-25
Proposed in-service date2021-12-31
Operational date
Withdrawn date2020-03-20
DeveloperLincoln Clean
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata