Mojave 16/17/18 BESS (67093_GEN 1)

Mojave 16/17/18 BESS is a 77.0 MW battery interconnection project in Kern, California with a current status of operational.

77.0 MWCapacity
OperationalStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameMojave 16/17/18 BESS
Queue ID67093_GEN 1
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyBattery
Capacity77.0 MW
StateCalifornia
CountyKern
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2020-08-01
Withdrawn date
Developer
Utility / transmission ownerTerra-Gen Operating Co-BESS 2

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.