MOJAVE SOLAR (909)

MOJAVE SOLAR is a 25.0 MW solar interconnection project in San Bernardino, California with a current status of operational. It is proposed to connect at Sandlot Substation 220kV.

25.0 MWCapacity
OperationalStatus
NOLMarket
SolarTechnology

Project facts

Canonical nameMOJAVE SOLAR
Queue ID909
Statusoperational
Source statusCOMPLETED
MarketNOL
TechnologySolar
Capacity25.0 MW
StateCalifornia
CountySan Bernardino
Point of interconnectionSandlot Substation 220kV
Requested (queue) date2012-04-02
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.