Monticello-East Winamac (J883)

Monticello-East Winamac is a 80.0 MW wind interconnection project in Pulaski County, Indiana with a current status of withdrawn. It is proposed to connect at Monticello-East Winamac.

80.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameMonticello-East Winamac
Queue IDJ883
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity80.0 MW
StateIndiana
CountyPulaski County
Point of interconnectionMonticello-East Winamac
Requested (queue) date2017-06-16
Proposed in-service date2020-10-01
Operational date2020-10-01
Withdrawn date2020-12-04
Developer
Utility / transmission ownerNORTHERN INDIANA PUBLIC SERVICE COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.