Moore Field BESS 2 (23INR0498)

Moore Field BESS 2 is a 9.8 MW other interconnection project in Hidalgo, Texas with a current status of operational. It is proposed to connect at Connected to AEP 12.47kV Substation_x000D_ Station Name (TSP Station Code): Moore Field (MOORE_FL)_x000D_ Load/Load Transformer Name: LD2_x000D_ PTI Bus Number: #80117_x000D_ Voltage in kV (Transmission Level): 138 kV_x000D_ Transformers: 3x 4000kVA 800VAC Δ - 12.47kVA Υ_x000D_ .

9.8 MWCapacity
OperationalStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameMoore Field BESS 2
Queue ID23INR0498
Statusoperational
Source statusoperational
MarketERCOT
TechnologyOther
Capacity9.8 MW
StateTexas
CountyHidalgo
Point of interconnectionConnected to AEP 12.47kV Substation_x000D_ Station Name (TSP Station Code): Moore Field (MOORE_FL)_x000D_ Load/Load Transformer Name: LD2_x000D_ PTI Bus Number: #80117_x000D_ Voltage in kV (Transmission Level): 138 kV_x000D_ Transformers: 3x 4000kVA 800VAC Δ - 12.47kVA Υ_x000D_
Requested (queue) date2023-07-14
Proposed in-service date2024-08-15
Operational date2024-06-18
Withdrawn date
DeveloperRegis Monte Cristo LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata