Moore (GEN-2015-088 Tap)-Pauline 345kV (GEN-2016-096)
Moore (GEN-2015-088 Tap)-Pauline 345kV is a 227.7 MW wind interconnection project in Fillmore, Nebraska with a current status of withdrawn. It is proposed to connect at Moore (GEN-2015-088 Tap)-Pauline 345kV.
227.7 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology
Project facts
| Canonical name | Moore (GEN-2015-088 Tap)-Pauline 345kV |
|---|---|
| Queue ID | GEN-2016-096 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | NE |
| Technology | Wind |
| Capacity | 227.7 MW |
| State | Nebraska |
| County | Fillmore |
| Point of interconnection | Moore (GEN-2015-088 Tap)-Pauline 345kV |
| Requested (queue) date | 2016-11-01 |
| Proposed in-service date | 2020-10-31 |
| Operational date | — |
| Withdrawn date | 2020-07-14 |
| Developer | — |
| Utility / transmission owner | NPPD |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata