Morris - Moorhead 230kV Line (GEN-2024-269)

Morris - Moorhead 230kV Line is a 315.0 MW solar interconnection project in OtterTail, Minnesota with a current status of withdrawn. It is proposed to connect at Morris - Moorhead 230kV Line.

315.0 MWCapacity
WithdrawnStatus
MNMarket
SolarTechnology

Project facts

Canonical nameMorris - Moorhead 230kV Line
Queue IDGEN-2024-269
Statuswithdrawn
Source statusWITHDRAWN
MarketMN
TechnologySolar
Capacity315.0 MW
StateMinnesota
CountyOtterTail
Point of interconnectionMorris - Moorhead 230kV Line
Requested (queue) date2025-03-01
Proposed in-service date2030-12-01
Operational date
Withdrawn date2025-12-01
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata