Morrisville 230kV (AH1-089 - moved to TC2)

Morrisville 230kV is a 20.0 MW battery interconnection project in Fauquier, Virginia with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameMorrisville 230kV
Queue IDAH1-089 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity20.0 MW
StateVirginia
CountyFauquier
Point of interconnection
Requested (queue) date2021-07-30
Proposed in-service date2029-12-01
Operational date
Withdrawn date2025-11-26
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata