Mountain Run-Mitchell 115 kV is a 50.0 MW solar interconnection project in Culpeper, Virginia with a current status of withdrawn.

50.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameMountain Run-Mitchell 115 kV
Queue IDAD1-115
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity50.0 MW
StateVirginia
CountyCulpeper
Point of interconnection—
Requested (queue) date2017-09-27
Proposed in-service date2027-06-30
Operational date—
Withdrawn date2026-02-23
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-28withdrawn_date—2026-02-23high
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.