Moyock 230 kV (AI1-169)

Moyock 230 kV is a 150.0 MW wind interconnection project in Currituck, North Carolina with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameMoyock 230 kV
Queue IDAI1-169
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity150.0 MW
StateNorth Carolina
CountyCurrituck
Point of interconnection—
Requested (queue) date2022-09-09
Proposed in-service date2026-10-15
Operational date—
Withdrawn date2025-04-14
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata