Mt. Jackson 34.5 kV (AE1-125)

Mt. Jackson 34.5 kV is a 18.9 MW solar interconnection project in Shenandoah, Virginia with a current status of withdrawn.

18.9 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameMt. Jackson 34.5 kV
Queue IDAE1-125
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity18.9 MW
StateVirginia
CountyShenandoah
Point of interconnection—
Requested (queue) date2018-09-19
Proposed in-service date2020-11-20
Operational date—
Withdrawn date2019-03-11
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.