Mt. Pleasant-Lums Pond 138 kV (AE1-107)

Mt. Pleasant-Lums Pond 138 kV is a 53.1 MW solar interconnection project in New Castle, Delaware with a current status of withdrawn.

53.1 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMt. Pleasant-Lums Pond 138 kV
Queue IDAE1-107
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity53.1 MW
StateDelaware
CountyNew Castle
Point of interconnection
Requested (queue) date2018-09-10
Proposed in-service date2021-09-30
Operational date
Withdrawn date2023-04-05
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata