Mud Lake - Benton County (GRE) 230kV (J3275)

Mud Lake - Benton County (GRE) 230kV is a 249.0 MW wind interconnection project in Benton, Minnesota with a current status of operational. It is proposed to connect at Mud Lake - Benton County (GRE) 230kV.

249.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameMud Lake - Benton County (GRE) 230kV
Queue IDJ3275
Statusoperational
Source statusActive
Market
TechnologyWind
Capacity249.0 MW
StateMinnesota
CountyBenton
Point of interconnectionMud Lake - Benton County (GRE) 230kV
Requested (queue) date2024-04-17
Proposed in-service date2028-09-04
Operational date2028-09-04
Withdrawn date
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.