Murphy Lake Solar (19INR0033)

Murphy Lake Solar is a 120.0 MW solar interconnection project in Kaufman, Texas with a current status of withdrawn. It is proposed to connect at 6904 CombinRC 138kV.

120.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameMurphy Lake Solar
Queue ID19INR0033
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity120.0 MW
StateTexas
CountyKaufman
Point of interconnection6904 CombinRC 138kV
Requested (queue) date2017-02-05
Proposed in-service date2021-03-15
Operational date
Withdrawn date2020-03-23
DeveloperS&R SOLAR DESIGN CORP
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata