Mustang Creek Storage (21INR0484)

Mustang Creek Storage is a 70.5 MW other interconnection project in Jackson, Texas with a current status of operational. It is proposed to connect at tap 138kV 5523 ETP - 78104 Ricebird new sub Galow.

70.5 MWCapacity
OperationalStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameMustang Creek Storage
Queue ID21INR0484
Statusoperational
Source statusoperational
MarketERCOT
TechnologyOther
Capacity70.5 MW
StateTexas
CountyJackson
Point of interconnectiontap 138kV 5523 ETP - 78104 Ricebird new sub Galow
Requested (queue) date2020-01-01
Proposed in-service date2024-03-04
Operational date2024-03-08
Withdrawn date
DeveloperGanado Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata