Nazareth Solar (16INR0049)

Nazareth Solar is a 203.0 MW solar interconnection project in Castro, Texas with a current status of operational. It is proposed to connect at tap 345kV 23914 Tule Canyon - 23912 Ogallala C2.

203.0 MWCapacity
OperationalStatus
CastroMarket
SolarTechnology

Project facts

Canonical nameNazareth Solar
Queue ID16INR0049
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketCastro
TechnologySolar
Capacity203.0 MW
StateTexas
CountyCastro
Point of interconnectiontap 345kV 23914 Tule Canyon - 23912 Ogallala C2
Requested (queue) date2014-06-19
Proposed in-service date
Operational date2027-08-31
Withdrawn date
DeveloperTX Nazareth Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.