Neal Solar II (23INR0420)

Neal Solar II is a 214.0 MW solar interconnection project in Wharton, Texas with a current status of withdrawn. It is proposed to connect at Tap 345kV 44000 WA Parish - 5915 South Texas Project CKT#39.

214.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameNeal Solar II
Queue ID23INR0420
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity214.0 MW
StateTexas
CountyWharton
Point of interconnectionTap 345kV 44000 WA Parish - 5915 South Texas Project CKT#39
Requested (queue) date2021-11-14
Proposed in-service date2024-10-31
Operational date
Withdrawn date2023-06-09
DeveloperNeal Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata