NEVADA MOHAVE SOLAR (1218)

NEVADA MOHAVE SOLAR is a 400.0 MW solar interconnection project in Clark, Nevada with a current status of withdrawn. It is proposed to connect at Jointly-owned Mohave Switchyard 500kV .

400.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameNEVADA MOHAVE SOLAR
Queue ID1218
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity400.0 MW
StateNevada
CountyClark
Point of interconnectionJointly-owned Mohave Switchyard 500kV
Requested (queue) date2015-04-30
Proposed in-service date
Operational date
Withdrawn date2021-01-19
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.