New Madison Co. Sub on Ft. Randall-Kelly 230 kV (GEN-2010-010)

New Madison Co. Sub on Ft. Randall-Kelly 230 kV is a 100.5 MW wind interconnection project in Madison County, Nebraska with a current status of withdrawn. It is proposed to connect at New Madison Co. Sub on Ft. Randall-Kelly 230 kV.

100.5 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameNew Madison Co. Sub on Ft. Randall-Kelly 230 kV
Queue IDGEN-2010-010
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity100.5 MW
StateNebraska
CountyMadison County
Point of interconnectionNew Madison Co. Sub on Ft. Randall-Kelly 230 kV
Requested (queue) date2010-03-29
Proposed in-service date
Operational date
Withdrawn date2011-10-13
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata