New Road 230 kV (AF1-066)

New Road 230 kV is a 50.0 MW battery interconnection project in Loudoun, Virginia with a current status of withdrawn.

50.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameNew Road 230 kV
Queue IDAF1-066
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity50.0 MW
StateVirginia
CountyLoudoun
Point of interconnection—
Requested (queue) date2019-08-02
Proposed in-service date2021-11-30
Operational date—
Withdrawn date2023-08-08
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.