new substation along existing NWE-Conteau Pondera Oil 69kV circuit (ASGI-2019-001)
new substation along existing NWE-Conteau Pondera Oil 69kV circuit is a 20.0 MW wind interconnection project in Teton, Minnesota with a current status of unknown. It is proposed to connect at new substation along existing NWE-Conteau Pondera Oil 69kV circuit.
20.0 MWCapacity
UnknownStatus
MNMarket
WindTechnology
Project facts
| Canonical name | new substation along existing NWE-Conteau Pondera Oil 69kV circuit |
|---|---|
| Queue ID | ASGI-2019-001 |
| Status | unknown |
| Source status | None |
| Market | MN |
| Technology | Wind |
| Capacity | 20.0 MW |
| State | Minnesota |
| County | Teton |
| Point of interconnection | new substation along existing NWE-Conteau Pondera Oil 69kV circuit |
| Requested (queue) date | 2019-02-01 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | WAPA/BEPC/HCPD Integrated System |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | unknown | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.