new substation along existing NWE-Conteau Pondera Oil 69kV circuit (ASGI-2019-001)

new substation along existing NWE-Conteau Pondera Oil 69kV circuit is a 20.0 MW wind interconnection project in Teton, Minnesota with a current status of unknown. It is proposed to connect at new substation along existing NWE-Conteau Pondera Oil 69kV circuit.

20.0 MWCapacity
UnknownStatus
MNMarket
WindTechnology

Project facts

Canonical namenew substation along existing NWE-Conteau Pondera Oil 69kV circuit
Queue IDASGI-2019-001
Statusunknown
Source statusNone
MarketMN
TechnologyWind
Capacity20.0 MW
StateMinnesota
CountyTeton
Point of interconnectionnew substation along existing NWE-Conteau Pondera Oil 69kV circuit
Requested (queue) date2019-02-01
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectunknownhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata