Newport News 23kV (AD2-049)

Newport News 23kV is a 10.0 MW battery interconnection project in City Of Newport News, Virginia with a current status of withdrawn.

10.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameNewport News 23kV
Queue IDAD2-049
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity10.0 MW
StateVirginia
CountyCity Of Newport News
Point of interconnection
Requested (queue) date2018-01-31
Proposed in-service date2021-04-30
Operational date
Withdrawn date2019-10-21
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata