Nockenut Springs Solar 1 (23INR0088)

Nockenut Springs Solar 1 is a 203.2 MW solar interconnection project in Guadalupe, Texas with a current status of operational. It is proposed to connect at tap 345kV 5133 Elm Creek - 5915 STP ckt 1.

203.2 MWCapacity
OperationalStatus
GuadalupeMarket
SolarTechnology

Project facts

Canonical nameNockenut Springs Solar 1
Queue ID23INR0088
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketGuadalupe
TechnologySolar
Capacity203.2 MW
StateTexas
CountyGuadalupe
Point of interconnectiontap 345kV 5133 Elm Creek - 5915 STP ckt 1
Requested (queue) date2020-09-25
Proposed in-service date
Operational date2029-06-05
Withdrawn date
DeveloperPecan Springs Energy, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata