Noor Solar (26INR0235)

Noor Solar is a 188.2 MW solar interconnection project in Liberty, Texas with a current status of withdrawn. It is proposed to connect at Tap 138kV 40390 Crosby - 40680 Placid Ckt 86.

188.2 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameNoor Solar
Queue ID26INR0235
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity188.2 MW
StateTexas
CountyLiberty
Point of interconnectionTap 138kV 40390 Crosby - 40680 Placid Ckt 86
Requested (queue) date2023-10-12
Proposed in-service date2028-03-01
Operational date
Withdrawn date2025-11-10
DeveloperIndustrial Kilo Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata