Noria Hondo Solar (Hybrid) is a 75.0 MW battery interconnection project in Kleberg, Texas with a current status of active.

75.0 MWCapacity
ActiveStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameNoria Hondo Solar (Hybrid)
Queue ID65344_66149
Statusactive
Source status(L) Regulatory approvals pending. Not under construction
MarketERCO
TechnologyBattery
Capacity75.0 MW
StateTexas
CountyKleberg
Point of interconnection
Requested (queue) date
Proposed in-service date2027-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNexus Renewable Power, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.