Kleberg County, Texas — Interconnection Projects

The interXdata warehouse tracks 6 interconnection projects in Kleberg, Texas, representing 765 MW of requested capacity.

6Total projects
2Active
2Operational
2Withdrawn
765 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar3575 MW
Battery2115 MW
Other175 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Santa Garcias Solar26INR0143Solar265.0 MWoperationalKleberg, Texas
Bowhead Solar24INR0132Solar165.0 MWwithdrawnKleberg, Texas
Noria Hondo Solar (Hybrid)65344_66148Solar145.0 MWactiveKleberg, Texas
French Riviera Storage24INR0516Other75.0 MWoperationalKleberg, Texas
Noria Hondo Solar (Hybrid)65344_66149Battery75.0 MWactiveKleberg, Texas
Bowhead Storage24INR0179Battery40.0 MWwithdrawnKleberg, Texas

Top developers

Developer (canonical)ProjectsCapacity
Baffin Bay Solar, LLC2205 MW
Arana Creek Battery Storage LLC175 MW
Oxy Renewable Energy LLC1265 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Kleberg County.

Start tracking with interXdata