North Leona BESS (28INR0120)

North Leona BESS is a 102.2 MW battery interconnection project in Frio, Texas with a current status of withdrawn. It is proposed to connect at Tap 138 KV 8212 Dilly - 5866 Palo Duro_x000D_ .

102.2 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameNorth Leona BESS
Queue ID28INR0120
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity102.2 MW
StateTexas
CountyFrio
Point of interconnectionTap 138 KV 8212 Dilly - 5866 Palo Duro_x000D_
Requested (queue) date2024-08-15
Proposed in-service date2028-08-01
Operational date
Withdrawn date2025-04-02
DeveloperOrion US Land Holding Co LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata