Notrees Battery Storage (12INR0076)

Notrees Battery Storage is a 36.0 MW battery interconnection project with a current status of operational. It is proposed to connect at NWF_NWF1 34.500.

36.0 MWCapacity
OperationalStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameNotrees Battery Storage
Queue ID12INR0076
Statusoperational
Source statusoperational
MarketERCOT
TechnologyBattery
Capacity36.0 MW
State
County
Point of interconnectionNWF_NWF1 34.500
Requested (queue) date2011-05-03
Proposed in-service date2013-01-21
Operational date2013-01-21
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata